2014 Capital Project – Civic Center Scope of Work

Preserving our resources and preparing for our students’ future.

- Install stair exit at Press Box
- Replace furnace – Zamboni Room
- Install panic bars at front entry (5) locations
- Add removable mullion (5) locations
- Install asphalt at side entry – Pad 12’ wide to road
- Provide sport floor for rink surfacing
- Upgrade Fire Alarm System (NCC)