2014 Capital Project – Bus Garage Scope of Work

Preserving our resources and preparing for our students’ future.

- Replace ceiling / PT
- Enclose soffits and overhangs at roofline
- Replace electric service from power pole to building
- Repave parking / drive area and replace sidewalk (or raise floor)
- Replace overhead doors
- Modify / enlarge restroom for ADA accessibility