2014 Capital Project – LP Quinn Scope of Work

Preserving our resources and preparing for our students’ future.

 

- Reconfigure parking for separation of student drop-off / bus lane
- Upgrade restrooms in classrooms (28) to comply with ADA
- Construct new outdoor pump house with restroom at upper
field
- Reconstruct / pipe size pump size of sewer system
- Replace unit ventilators
- Replace original windows with energy efficient windows
- Renovate K-4 student storage units
- Replace roofing at 3rd Grade and main roof
- Create private new entrance for students to counselor office
- Replace original part of gym floor
- Install new cooler and kitchen refrigerator / ovens
- Add electric power and water to baseball and soccer fields
- Add storage, concession, restrooms near softball field
- Install exterior bleacher pads (12’ x 8’), portable bleachers
- Install new fence and backstop at varsity baseball field
- Install dual use scoreboard for soccer / baseball field
- Level, add topsoil, seed, fertilize JV baseball and JV soccer fields
- Install 10’ asphalt drive around rear of school  (700 lf)
- Re-surface track